Palisades Fire Response
EPA Palisades Fire Response - Phase 1 Hazardous Materials Removal
Anacapa Environmental provided environmental and safety leadership in support of EPA- led hazardous materials removal operations following the Palisades Fire. Services including large- scale air monitoring, hazardous material identification and segregation, HAZWOPER- aligned safety integration, and environmental documentation control under accelerated emergency response conditions.
USACE Palisades Fire - Phase 2 Debris Removal
Anacapa Environmental support U.S. Army Corps of Engineers Phase 2 debris removal operations through Contractor Quality Control (CQC) oversight and environmental compliance verification. Work included enforcement of DROP requirements, inspection of environmental protection measures, and documentation review prior to federal acceptance.